Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 40 results ...

Al-Shammaa, M M J (2019) Improving risk management in megaprojects, Unpublished PhD Thesis, , University of Leeds.

Alkhorayef, A N M (2014) Improving decision making on large scale investment projects: A psychological perspective, Unpublished PhD Thesis, , University of Leeds.

Alnsour, M A M (2020) Integrating sustainability assessment into public works development in Jordan, Unpublished PhD Thesis, School of Civil Engineering, University of Leeds.

Anumba, C J (1989) An integrated two and three dimensional data structure for a structural engineering CAD system, Unpublished PhD Thesis, , University of Leeds.

Barnes, G R (2016) Market creation in the European Union: the case of the public procurement directives, Unpublished PhD Thesis, School of Politics and International Studies, University of Leeds.

Birchall, S J (2011) An appraisal of the performance of a 'green' office building, Unpublished PhD Thesis, , University of Leeds.

Dakas, A I I (2014) Management of project stakeholders: facilitating project success in public sector projects in Nigeria , Unpublished PhD Thesis, School of Civil Engineering, University of Leeds.

Davis, M C (2011) Psychological and organisational issues in the design of buildings and workplaces, Unpublished PhD Thesis, , University of Leeds.

El-Samadony, A A E-Y (1986) Development of an improved construction bidding model incorporating multiple objective functions, Unpublished PhD Thesis, , University of Leeds.

Elmahroug, M H M (2018) Facilitating effective external stakeholder involvement in the pre-design phase of civil engineering infrastructure projects, Unpublished PhD Thesis, School of Civil Engineering, University of Leeds.

Ghazali, F E M (2007) A reenginered model for effective risk management in pre-contractual procurement process for NHS PFI hospitals, Unpublished PhD Thesis, School of Civil Engineering, University of Leeds.

Giesekam, J J (2016) The contribution to UK climate mitigation targets from reducing embodied carbon in the construction sector, Unpublished PhD Thesis, School of Chemical and Process Engineering, University of Leeds.

Gkiourka, P (2011) Managing innovation in the construction industry, Unpublished PhD Thesis, School of Civil Engineering, University of Leeds.

Grady, K (1980) The provision of public buildings in the West Riding of Yorkshire, c.1600-1840, Unpublished PhD Thesis, School of Economic Studies, University of Leeds.

  • Type: Thesis
  • Keywords: investment; population; private sector; economic development; economic history; public sector buildings; Yorkshire; UK
  • ISBN/ISSN:
  • URL: http://etheses.whiterose.ac.uk/6757/
  • Abstract:
    The study makes a comparative analysis of the provision of public buildings in the twelve principal West Riding towns between 1600 and 1840. It includes an illustrated survey of the changes in the physical form and amenities of buildings over the period and a 170-page gazetteer with details of all the public buildings provided in the towns between 1100 and 1840. Over six hundred buildings were provided between 1100 and 1840. Approximately three-quarters were purpose-built, the remainder being existing premises converted for public use. The rate of provision rose sharply in the second half of the eighteenth century, coinciding with the onset of the Industrial Revolution and rapid population growth. This acceleration was accompanied by a high level of expenditure (£1.2 million between 1750 and 1840) and a notable rise in spending on individual buildings. Despite differences in the type and size of buildings erected in each town, little important variation in per capita spending, is apparent; only in the "county town", Wakefield, was expenditure significantly above average. The promotion and organization of building projects could be a complex and drawn-out affair. The typical structure took about two years to erect, but the larger ones might take up to five or six years. The public sector played a subordinate role in provision, contributing no more than one-third of the finance throughout our period. This was not purely the product of laissez-faire attitudes since lack of funds proved a serious problem; some public bodies engaged enthusiastically in building activities. The remaining two-thirds of finance came from the private sector. Although its activities often were motivated by benevolence, self-preservation, desire for amenity, and civic pride, not infrequently buildings were regarded as sound economic investments. Two factors exerted considerable influence on the timing of the provision of buildings. The first was a combination of urban rivalry, emulation, and civic pride: the provision of an amenity in one town sometimes set off a chain reaction elsewhere. The second was the state of the economy. It is evident that building provision rose and fell in association with pronounced upturns and downturns in general economic activity. Assessing the contribution of public buildings to economic development is a hazardous, if not impossible, task. Suffice it to say that, if the West Riding' s experience was typical, between 1750 and 1840 the acceleration of investment in them compared favourably with that occurring in other sectors of the British economy.

Hagan, G N (2013) Managing complex construction projects in it multiproject environment by the contractor, Unpublished PhD Thesis, School of Civil Engineering, University of Leeds.

Hakim, H (2011) Effective contract structures and value for money in PFI social housing projects, Unpublished PhD Thesis, School of Sociology and Social Policy, University of Leeds.

Harun, Z B (1993) Computer simulation in decision support systems for management of construction projects, Unpublished PhD Thesis, , University of Leeds.

Heineck, L F (1983) On the analyses of activity durations on three house building sites, Unpublished PhD Thesis, , University of Leeds.

Invernizzi, D C (2019) Benchmarking nuclear decommissioning, Unpublished PhD Thesis, , University of Leeds.

KasĖŒpar, H M P (2022) Robert Adam and networks for building in eighteenth-century Britain, Unpublished PhD Thesis, , University of Leeds.

Kerr, N J (2018) The rationale for retrofit: A multi-level, interdisciplinary perspective on the energy efficient retrofit of existing residential buildings, Unpublished PhD Thesis, , University of Leeds.

Kibwami, N (2016) Enhancing sustainable construction in the building sector of Uganda using embodied carbon accounting, Unpublished PhD Thesis, , University of Leeds.

Li, D (2012) Development of a framework of competitive advantage in non-state construction contractors in China, Unpublished PhD Thesis, Business School, University of Leeds.

Li, Q (2012) Inter-organizational relationships in the programme management lifecycle, Unpublished PhD Thesis, Business School, University of Leeds.

Liang, S (2013) Legal aspects of privately financed infrastructure projects (PFIPs) in China: the case for international standards, Unpublished PhD Thesis, Business School, University of Leeds.

Lu, L-T (2003) The impact of cultural distance on the management style and performance of Japanese and Taiwanese joint ventures with local partners in China, Unpublished PhD Thesis, Business School, University of Leeds.

Luise Valencia Gluyas, J (2004) Public-private participation in water infrastructure in Mexico, Unpublished PhD Thesis, School of Civil Engineering, University of Leeds.

Mlybari, E A A (2011) Managing value, requirements and risk in the appraisal stage of UK construction projects, Unpublished PhD Thesis, School of Civil Engineering, University of Leeds.

Nguyen, Q T (2009) Developing a strategic model for small-and-medium-sized construction firms in Vietnam, Unpublished PhD Thesis, , University of Leeds.

Oliomogbe, G O (2017) The investigation of the generation of intangible benefits through project management, Unpublished PhD Thesis, , University of Leeds.

Riley, F G (2018) Information behaviour in construction project management teams: contradictions, motivations and influencing factors, Unpublished PhD Thesis, School of Civil Engineering, University of Leeds.

Sainati, T (2018) Governance of infrastructure megaprojects : The role of the special purpose entities, Unpublished PhD Thesis, , University of Leeds.

Seboni, L (2016) Improving the existing project manager-to-project practice of a specific organization (organization A) in Botswana, Unpublished PhD Thesis, , University of Leeds.

Soliman, M M A E I (2014) Risk management in international construction joint ventures in Egypt, Unpublished PhD Thesis, School of Civil Engineering, University of Leeds.

Spiteri, J (1998) A critical analysis of occupational and organisational strategy in UK: architectural and quantity surveying practices, Unpublished PhD Thesis, , University of Leeds.

Tan, Y (2006) A case-based reasoning approach to improve risk identification in construction projects, Unpublished PhD Thesis, School of Civil Engineering, University of Leeds.

Valencia Gluyas, J L (2004) Public- private participation in water infrastructure in Mexico, Unpublished PhD Thesis, , University of Leeds (United Kingdom).

Wasiluk, K L (2012) Sustainable wealth creation in practice: a framework to manage firm's intangibles, Unpublished PhD Thesis, School of Earth and Environment, University of Leeds.

Wheat, P E (2013) Econometric cost analysis in vertically separated railways, Unpublished PhD Thesis, Institute for Transport Studies, University of Leeds.

Woodhead, R M (1999) The influence of paradigms and perspectives on the decision to build undertaken by large experienced clients of the UK construction industry, Unpublished PhD Thesis, School of Civil Engineering, University of Leeds.